Product Details:
Payment & Shipping Terms:
|
Material: | Q235 Steel Channel [12 | OEM: | Available |
---|---|---|---|
Finishing: | Painted, Powder Coated, Or As Per Request | Application: | For Retaining Wall Concrete |
Height: | Up To 3.3m | Shifting: | By Crane |
High Light: | one sided wall formwork,single sided concrete wall forms |
Single Sided Formwork Supported by Telescopic Brace in Retaining Wall Concrete
Bracing support single-sided formwork is also used for single-side structural walls construction. With simple structure, less weight and components, it is the ideal solution for walls less than 3.3 m high.
The push-pull braces are used to align and support the formwork. The loads resulting from the pouring are transferred into the push-pull brace and the cast-in tie anchors at the front base of the vertical waling.
Connection between formwork panels and vertical waling is quickly and easily done with connectors. Besides, the vertical waling is anchored to the ground by rods previously embedded in the foundation.
Advantages:
1. The concrete pressure are reliably transferred to the embedded anchor systems and push-pull braces.
2. The maximum wall height is up to 3.3 m.
3. Once assembled, each set of bracket and panels can be easily lifted and moved to the required pouring location.
4. For safety, working platforms can be fixed into these systems
Components | Specification / description |
Vertical waling | [12 steel channel |
Push-pull brace | To support formwork |
Cross beam |
The cross beams are fastened to the frames by means of screw tie rods connected to the anchor system which are pre-casted in the concrete ground. Also, cross beam links single-sided frames in horizontal position to form a unit for lifting. |
Anchor rod D20 |
Cast in concrete and discharges the tensile loads into the building structure. With Dywidag thread, to transfer the load from the supporting frames into the floor slab or foundation.
|
Coupling nut D20 | With hexagonal head, to connect cast-in anchor rod and re-usable anchor elements. |
Top scaffold bracket |
Painted, severs as safety working platform |
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Contact Person: Mr. H. Chang
Tel: +86 319 3188757
Fax: 86-319-3156299