EN1065 Steel Props of Telescopic Length up to 5.5 m for Slab Construction
HORIZON EN1065 Props are designed for the shoring of horizontal form work as well as for the various requirements of shoring that may arise on site, however always respect load capacity limitations and assembly instructions.
The high load capability makes HORIZON props the top choice offering reliability and safety for any construction job.
Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props. All these result in safe and efficient use on sites.
The manufacture of Telescopic Props is certified in accordance with standard EN 1065.
Specification | Capacity (KN) | Height (mm) | Dia (mm) | Weight (Kg) |
HZP30-300 | 30 | 1650-3000 | 76/63 | 20.9 |
HZP30-350 | 30 | 1970-3500 | 76/63 | 23.0 |
HZP30-400 | 30 | 2210-4000 | 76/63 | 25.0 |
HZP20-300 | 20 | 1650-3000 | 60/48 | 15.7 |
HZP20-350 | 20 | 1970-3500 | 60/48 | 16.6 |
HZP20-450 | 20 | 2460-4500 | 60/48 | 28.2 |
HZP20-500 | 20 | 2710-5000 | 60/48 | 30.5 |
Important Instructions:
• Respect the prop spacing in accordance with the project.
• Prop load capacities and engineer’s design must be observed.
• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.
• Check formwork and prop erection before concrete pouring.
• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.
• Avoid the sudden emptying of the concrete bucket onto the formwork.
• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.
• Before starting any dismantling operation, check the state of the props.
• After removal, props should not be irregularly piled up.
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Contact Person: Mr. H. Chang
Tel: +86 319 3188757
Fax: 86-319-3156299