|
Product Details:
Payment & Shipping Terms:
|
| Material: | Q235 Steel Plate | OEM: | Available |
|---|---|---|---|
| Finishing: | Galvanized Yellow | Application: | For Scaffold Tube 48.3mm Connection |
| Size: | For Pipe 48.3x48.3 | Standard: | BS1139 |
| Customer Logo: | Available | ||
| Highlight: | scaffolding attachments,metal scaffolding parts |
||
BS Sleeve coupler for Connecting Scaffold Pipes, Pressed Sleeve Joint Clamp
To connect 2 scaffold tubes of Ø48.3 mm at 180 degree.
1. Scaffold sleeve coupler, British type sleeve clamp for pipe dia 48.3x48.3mm
2. Surface treatment: self colour(black), galvanized upon request.
3. Safe and standard package, 25 pcs in bags or cartons, and then on pallet, suits for long distance delivery.
5. Apply to EN74 standard.
| Items | Pipe diameter | Weight (Kg) | Tech. |
| Swivel coupler BS1139 | 48.3*48.3mm | 1.05 | Pressed |
| Double coupler BS1139 | 48.3*48.3mm | 0.85 | Pressed |
| Sleeve coupler BS1139 | 48.3*48.3mm | 1.00 | Pressed |
| Single coupler BS1139 | 48.3mm | 0.52 | Pressed |
| Board retaining coupler BS1139 | 48.3mm | 0.62 | Pressed |
| Putlog coupler BS1139 | 48.3mm | 0.62 | Pressed |
![]()
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Contact Person: Mr. H. Chang
Tel: +86 319 3188757
Fax: 86-319-3156299