Product Details:
Payment & Shipping Terms:
|
Material: | Steel Bar | OEM: | Yes |
---|---|---|---|
Application: | To Connect H20 Beam And Waling | Type: | Doka Type |
Width: | 120mm | Width-across: | 190mm |
High Light: | concrete formwork accessories,construction formwork accessories |
Flange Clamp H20 to Connect Timber Beam onto Steel Waling in Wall Formwork
Flange clamp is used for fastening timber beam H20 anywhere on the steel waling.
1). Push the Flange clamps onto the timber beam H20.
2). Before tightening them to the steel waling, make sure that they are centrically positioned.
3). Gently tighten on one side. Tap the stirrup with a hammer to ensure that the clamp is sitting correctly.
4). Tighten the clamp on the other side and tap the stirrup with the hammer.
5). Tighten the first side of the clamp completely.
Mount the flange clamps with the hexagonal nuts facing downwards (towards the bottom of the formwork). This protects the nuts against soiling during pouring concrete.
Bar Ø (mm) | Width (mm) | Width-across (mm) | Weight (Kg) |
12 | 120 | 190 | 1.0 |
Wall Formwork Components:
Components | Specification / description |
Wall formwork panel | For all vertical formworks |
H20 Timber beam |
Water proof treated |
Steel waling |
Painted, powder coated |
Flange clamp |
Galvanized |
Panel strut |
Painted |
Waling connector 80 |
Painted |
Corner connector 60x60 |
Painted |
Top scaffold bracket |
Painted, |
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Contact Person: Mr. H. Chang
Tel: +86 319 3188757
Fax: 86-319-3156299