Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted

Certification
China HORIZON FORMWORK CO., LTD. certification
China HORIZON FORMWORK CO., LTD. certification
Customer Reviews
The delivery time is quick, and very important: the products always sent match the order. I trust them because i've never been disapointed with them.

—— Laura

This mutual cooperation last for about 4 years,and must admit the service they provide is aboved expected. Our cooperation will last for many years.

—— Kresimir Brebric

I'm Online Chat Now

Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted

Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted
Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted

Large Image :  Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted

Product Details:
Place of Origin: CHINA
Brand Name: HORIZON
Model Number: shaft platform
Payment & Shipping Terms:
Minimum Order Quantity: 100 sets
Price: pls ask HORIZON
Packaging Details: pallets, bundles, bulk
Delivery Time: 20-25 days
Payment Terms: L/C, T/T
Supply Ability: 100 tons per week
Detailed Product Description
Material: Steel Square Tube, Panel Strut OEM: Available
Colour: Painted Blue Or Tailor Made Shaft Width: Telescopic Length 1.45m - 3.9m
Climbing Style: By Crane Application: For Internal Stairwell Formwork
High Light:

climbing scaffolding system

,

self climbing scaffold system

Shaft Platform with Trailing Level for Internal Stairwell Formwork Construction

 

Climbing shaft platform is the simple solution for supporting shaft internal formwork in stairwells and elevator shafts.

It consists of telescopic platform beams that are tailored to match the respective shaft dimensions.

The decking is supported by H20 timber beams which are fastened to the platform beams.

 

The internal platform complete reposition quickly and easily in a single crane lift.
The internal platform provides a spacious working area for formwork, reinforcement, cleaning etc..

And also, it serves as a safety protection against any falling to the downstairs. The telescopic shaft beams can be simply adapted to any set of dimensions within 1.45m to 3.9m. This makes assembly quick and easy, and speed formwork positioning and retraction without crane.

 

Two support possibilities

1). Shaft platform with climbing cone

In case it is not allowed to leave a hole in the wall, the support of the shaft platform can be provided on climbing cone. For the safety, the shaft platform is combined with a finishing platform on which workers can remove the lower climbing cones and do some cleaning.

 

2). Shaft platform with gravity pawl

When a hole is allowed to leave in the wall, this system is the economical option to choose. When lifting the shaft platform to next floor, the gravity pawl will drop automatically into the holes provided for them in the wall. For this option, the finishing platform is avoidable, which saves time, cost and seems to be simple.

 

Telescopic Shaft Beam Working Length Range (mm)
         Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted 0 1450-1700
1600-1900
1800-2200
2100-2800
2700-3900

Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted 1

 

 

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.


 

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.


What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.


Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.


HORIZON FORMWORK, your reliable formwork partner!

Steel Square Tube Climbing Formwork System , Trailing Level Shaft Platform Painted 2

Contact Details
HORIZON FORMWORK CO., LTD.

Contact Person: Mr. H. Chang

Tel: +86 319 3188757

Fax: 86-319-3156299

Send your inquiry directly to us (0 / 3000)