Product Details:
Payment & Shipping Terms:
|
Material: | H20 Beam, Steel Waling, Climbing Bracket | OEM: | Available |
---|---|---|---|
Colour: | Yellow & Blue | Climbing Type: | By Crane Lift |
Applications: | For Core Wall, Bridges Piers, Etc. | Cycle Time: | 5-7 Days Per Cycle |
Highlight: | jump formwork system,self climbing scaffold system |
High Efficient Climbing System for Construction of Core Wall and Bridge Piers
Climbing system CB240 is crane dependent, serving as a support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.
Advantages:
Platform width: 2.4m
Roll-back system: 70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system: should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork: can be moved horizontally, vertically and tilted to meet site requirement.
Main platform: provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.
1. Climbing bracket
2. Main platform
3. Pouring platform
4. Finishing platform
5. Roll-back system
6. Push-pull prop
7. Vertical waling
8. Anchor system
9. Formwork
|
Components | Diagram / photo | Specification / description |
Climbing bracket | For all vertical formworks | |
H20 Timber beam |
Water proof treated Height: 200mm Width: 80mm Length: as per table size |
|
Steel waling |
Painted, powder coated [12 steel channel
|
|
Flange clamp |
Galvanized To connect steel waling and H20 beams |
|
Panel strut |
Painted
|
|
Waling connector 80 |
Painted Used for formwork panels alignment |
|
Corner connector 60x60 |
Painted Used for forming inner corner formwork with wedge pins |
|
Top scaffold bracket |
Painted, severs as safety working platform
|
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Contact Person: Mr. H. Chang
Tel: +86 319 3188757
Fax: 86-319-3156299