Product Details:
Payment & Shipping Terms:
|
Material: | Ductile Cast Iron | OEM: | Available |
---|---|---|---|
Size: | For Tie Rod Dia 15mm, 20mm, 26.5mm | Application: | For Concrete Formwork |
Length: | 110mm | Samples: | Available |
Product Name: | Concrete Steel Formwork Tie Nut,Peri Formwork Tie Rod Nut,wall Tie Rod System B Washer Plastic Cone D Cone P Cone With Hex Nut | Surface Treatment: | Zinc,Cold Galvanizing,Galvanized/Black,Galvanized Or Plain |
Packing: | Bags Or Pallets | ||
High Light: | shuttering tie rod,tie rod scaffolding |
Formwork Tie Rod Water Stopper for Retaining wall structures in construction
Water stops are used in water retaining structures, casted into the concrete wall between two separate tie bars, to prevent water seeping alongside the thread bar. After pouring concrete, tie rods are removed, the water stop remains in concrete.
Item No. | Bar dia (mm) | Length(mm) | Plate/Spigot (mm) | Weight (Kg) |
WS-15A | 15 | 110 | 60/26 | 0.44 |
WS-15B | 15 | 110 | 65/26 | 0.56 |
WS-15C | 15 | 130 | 110/26 | 0.96 |
WS-20 | 20 | 160 | 80/31 | 1.26 |
The spigot size for tubes inner dia 26mm or 31mm.
Material: Ductile casting, Galvanized
Besides the above specifications, customerized sizes available upon drawing or samples.
Part Name | Specification | Weight (kg) | Remark |
Tie-rod
|
D15 D20 |
1.52 kg/m 2.71 kg/m |
L=6m; Special length available upon request. |
Wing nut
|
D15 D20 |
0.35 0.70 |
For tie-rod D15 / D20 |
Super plate
|
D15 | 1.28 | Used in case of tie-rod and formwork panels are not vertical. |
3-lug wing nut
|
D15 D20 |
0.97 0.78 |
For tie-rod D15; For tie-rod D20 |
Waling plate
|
120 x 120 x 6, Φ19 120 x 120 x 8, Φ19 |
0.65 0.85 |
For tie-rod and nut D15; galvanized |
Water stopper
|
D15 D20 |
0.55 0.72 |
Used in water resistant wall; With tie-rod D15 / D20 |
Anchor plate
|
D20 | 0.95 | Embedded in concrete as lost part |
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.
What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.
Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.
We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.
HORIZON FORMWORK, your reliable formwork partner!
Contact Person: Mr. H. Chang
Tel: +86 319 3188757
Fax: 86-319-3156299