HORIZON FORMWORK CO., LTD.

 

Professional manufacturer of formwork and scaffolding systems

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsFormwork Tie Rod System

Water Stopper Formwork Tie Rod System For Retaining Wall Structures In Construction

Certification
China HORIZON FORMWORK CO., LTD. certification
China HORIZON FORMWORK CO., LTD. certification
Customer Reviews
The delivery time is quick, and very important: the products always sent match the order. I trust them because i've never been disapointed with them.

—— Laura

This mutual cooperation last for about 4 years,and must admit the service they provide is aboved expected. Our cooperation will last for many years.

—— Kresimir Brebric

I'm Online Chat Now

Water Stopper Formwork Tie Rod System For Retaining Wall Structures In Construction

Water Stopper Formwork Tie Rod System For Retaining Wall Structures In Construction
Water Stopper Formwork Tie Rod System For Retaining Wall Structures In Construction Water Stopper Formwork Tie Rod System For Retaining Wall Structures In Construction Water Stopper Formwork Tie Rod System For Retaining Wall Structures In Construction

Large Image :  Water Stopper Formwork Tie Rod System For Retaining Wall Structures In Construction

Product Details:
Place of Origin: CHINA
Brand Name: HORIZON
Certification: SGS
Model Number: flange water stop
Payment & Shipping Terms:
Minimum Order Quantity: 10000 pcs
Price: pls ask HORIZON
Packaging Details: pallets, bundles, bulk
Delivery Time: 15-25 days
Payment Terms: L/C, T/T
Supply Ability: 10000 pcs per week
Detailed Product Description
Material: Ductile Cast Iron OEM: Available
Size: For Tie Rod Dia 15mm, 20mm, 26.5mm Application: For Concrete Formwork
Length: 110mm Samples: Available
Product Name: Concrete Steel Formwork Tie Nut,Peri Formwork Tie Rod Nut,wall Tie Rod System B Washer Plastic Cone D Cone P Cone With Hex Nut Surface Treatment: Zinc,Cold Galvanizing,Galvanized/Black,Galvanized Or Plain
Packing: Bags Or Pallets
High Light:

shuttering tie rod

,

tie rod scaffolding

Formwork Tie Rod Water Stopper for Retaining wall structures in construction

 

Water stops are used in water retaining structures, casted into the concrete wall between two separate tie bars, to prevent water seeping alongside the thread bar. After pouring concrete, tie rods are removed, the water stop remains in concrete.

Item No. Bar dia (mm) Length(mm) Plate/Spigot (mm) Weight (Kg)
WS-15A 15 110 60/26 0.44
WS-15B 15 110 65/26 0.56
WS-15C 15 130 110/26 0.96
WS-20 20 160 80/31 1.26


The spigot size for tubes inner dia 26mm or 31mm.
Material: Ductile casting, Galvanized
Besides the above specifications, customerized sizes available upon drawing or samples.

 

 

Part Name Specification Weight (kg) Remark

Tie-rod

 

D15

D20

1.52 kg/m

2.71 kg/m

L=6m;

Special length available upon request.

Wing nut

 

D15

D20

0.35

0.70

For tie-rod D15 / D20

Super plate

 

D15 1.28 Used in case of tie-rod and formwork panels are not vertical.

3-lug wing nut

 

D15

D20

0.97

0.78

For tie-rod D15;

For tie-rod D20

Waling plate

 

120 x 120 x 6, Φ19

120 x 120 x 8, Φ19

0.65

0.85

For tie-rod and nut D15;

galvanized

Water stopper

 

D15

D20

0.55

0.72

Used in water resistant wall;

With tie-rod D15 / D20

Anchor plate

 

D20 0.95 Embedded in concrete as lost part


Water Stopper Formwork Tie Rod System For Retaining Wall Structures In Construction 0Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
--- bundles: timber beam, steel props, tie rod, etc.
--- pallet: small parts will be put in bags and then on pallets.
--- wooden cases: it is available on customer's request.
--- bulk: some irregular goods will be loaded in bulk in container.


Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.


What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.


Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.


HORIZON FORMWORK, your reliable formwork partner!

 

Contact Details
HORIZON FORMWORK CO., LTD.

Contact Person: Mr. H. Chang

Tel: +86 319 3188757

Fax: 86-319-3156299

Send your inquiry directly to us (0 / 3000)